Advertisement

Ad promo image large
  • Published Date

    April 6, 2022
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

St.Regis 90 West Construction is resuming on the I I 90 St. Regis West Project St. TO IDAHO UA WORK COMPLETED IN 2021 135 EXIT 26 889 WARD CREEK RD ST. REGIS EXIT 30 Map not to scale 431 ST REGIS RIVER 282 EXIT 33 TWO MILE RD MISSOULA REMAINING WORK TO BE COMPLETED IN 2022 Remaining work to be completed in 2022 includes: Rejuvenating and strengthening the eastbound lanes located west of the St. Regis Interchange (Exit 33). Chip sealing the St. Regis Interchange ramps (Exit 33) and the Two Mile Road Interchange ramps (Exit 30). What to expect through the work zone: Traffic will be reduced to one lane in each direction. Both east and westbound traffic will travel on the same side of I 90 between the St. Regis and Drexel interchanges. Speed limits will be reduced. Width restrictions will be in place (Visit www.511mt.net for the most up-to-date information). SIGN UP FOR CONSTRUCTION EMAIL UPDATES TEXT REGISWEST to 22828 EMAIL Brandon@rbci.net CALL THE PROJECT HOTLINE 406-465-3350 * Texting alerts are not managed by MDT and may have different privacy and security policies. For more information read the Simple Texting Privacy Policy by visiting: https://simpletexting.com/privacy-policyl Alternative accessible formats of this document will be provided on request. Persons who need an alternative format should contact the Office of Civil Rights, Department of Transportation, 2701 Prospect Avenue, PO Box 201001, Helena, MT 59620. Telephone 406-444-5416 or Montana Relay Service at 711. SLOW FOR THE ZONE. GIVE WORKERS A BRAKE. Stay alert. Better roads ahead! VISION ZERO CLARK FORK RIVER St.Regis 90 West Construction is resuming on the I I 90 St. Regis West Project St. TO IDAHO UA WORK COMPLETED IN 2021 135 EXIT 26 889 WARD CREEK RD ST. REGIS EXIT 30 Map not to scale 431 ST REGIS RIVER 282 EXIT 33 TWO MILE RD MISSOULA REMAINING WORK TO BE COMPLETED IN 2022 Remaining work to be completed in 2022 includes: Rejuvenating and strengthening the eastbound lanes located west of the St. Regis Interchange (Exit 33). Chip sealing the St. Regis Interchange ramps (Exit 33) and the Two Mile Road Interchange ramps (Exit 30). What to expect through the work zone: Traffic will be reduced to one lane in each direction. Both east and westbound traffic will travel on the same side of I 90 between the St. Regis and Drexel interchanges. Speed limits will be reduced. Width restrictions will be in place (Visit www.511mt.net for the most up-to-date information). SIGN UP FOR CONSTRUCTION EMAIL UPDATES TEXT REGISWEST to 22828 EMAIL Brandon@rbci.net CALL THE PROJECT HOTLINE 406-465-3350 * Texting alerts are not managed by MDT and may have different privacy and security policies. For more information read the Simple Texting Privacy Policy by visiting: https://simpletexting.com/privacy-policyl Alternative accessible formats of this document will be provided on request. Persons who need an alternative format should contact the Office of Civil Rights, Department of Transportation, 2701 Prospect Avenue, PO Box 201001, Helena, MT 59620. Telephone 406-444-5416 or Montana Relay Service at 711. SLOW FOR THE ZONE. GIVE WORKERS A BRAKE. Stay alert. Better roads ahead! VISION ZERO CLARK FORK RIVER