Advertisement

Ad promo image large
  • Published Date

    May 22, 2024
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

FLATHEAD RIVER BRIDGE PERMA Construction Resumes The Montana Department of Transportation (MDT) and Frontier West are resuming work on the bridge that carries Secondary Highway 382 (S 382) over the Flathead River near Perma. HOT SPRINGS PABLO 200 Map not 28 PLAINS 382 to scale PROJECT AREA Flathead River ST REGIS 135 200 PERMA 90 RAVALLI 93 Construction activities planned for 2024: Painting portions of the steel structure to slow corrosion. Installing advance warning rumble strips and signage for the intersection of S 382 with Montana Highway 200 (MT 200). Paving bridge approaches. Applying final striping. Work on this project is anticipated to be completed in 2024. Once work resumes, motorists can expect single-lane traffic across the bridge, reduced speed limits, traffic directed by flaggers or traffic-sensing smart signals, and river traffic may be directed to one side of the river at times. * MONTANA Department of Transportation QUESTIONS OR COMMENTS? CONTACT: Brandon Coates, Public Involvement Manager EMAIL: Brandon@rbci.net PHONE: 406-545-0800 Alternative accessible formats of this document will be provided on request. Persons who need an alternative format should contact the Office of Civil Rights, Montana Department of Transportation, 2701 Prospect Avenue, PO Box 201001, Helena, MT 59620. Telephone 406-444-5416 or Montana Relay Service at 711. This document is printed at state expense. Information on the cost of producing this publication may be obtained by contacting the Department of Administration. FLATHEAD RIVER BRIDGE PERMA Construction Resumes The Montana Department of Transportation ( MDT ) and Frontier West are resuming work on the bridge that carries Secondary Highway 382 ( S 382 ) over the Flathead River near Perma . HOT SPRINGS PABLO 200 Map not 28 PLAINS 382 to scale PROJECT AREA Flathead River ST REGIS 135 200 PERMA 90 RAVALLI 93 Construction activities planned for 2024 : Painting portions of the steel structure to slow corrosion . Installing advance warning rumble strips and signage for the intersection of S 382 with Montana Highway 200 ( MT 200 ) . Paving bridge approaches . Applying final striping . Work on this project is anticipated to be completed in 2024. Once work resumes , motorists can expect single - lane traffic across the bridge , reduced speed limits , traffic directed by flaggers or traffic - sensing smart signals , and river traffic may be directed to one side of the river at times . * MONTANA Department of Transportation QUESTIONS OR COMMENTS ? CONTACT : Brandon Coates , Public Involvement Manager EMAIL : Brandon@rbci.net PHONE : 406-545-0800 Alternative accessible formats of this document will be provided on request . Persons who need an alternative format should contact the Office of Civil Rights , Montana Department of Transportation , 2701 Prospect Avenue , PO Box 201001 , Helena , MT 59620. Telephone 406-444-5416 or Montana Relay Service at 711 . This document is printed at state expense . Information on the cost of producing this publication may be obtained by contacting the Department of Administration .